Craiglie Reservoir Renewal

About the project

Pensar were engaged to extend the service life of the Craiglie Reservoir.

Location

Craiglie, Queensland

Client & Duration

Douglas Shire Council
September 2020 - November 2020

Project Scope

  • Abrasive blasting was used to prepare the internal surface of the reservoir
  • An epoxy render was applied to the walls followed by a 3mm polyruea lining on the floors and walls
  • A polyurethane protective coating was applied to the external walls of the reservoir

Challenges

  • The environmental conditions proved challenging due to the project being located in far North Queensland

Achievements

  • Approximately 900m2 of epoxy render was applied in 3.5 days and 1700m2 of polyurea was sprayed to the walls and floors of the reservoir
  • Stopaq tape and polyurea were used to terminate the lining on the stainless steel columns inside the reservoir

Get the latest news

The future demands new thinking, new approaches, and new solutions. We’d love to share how we’re using the unique expertise and skills of our people to design a better world, and the work we’re doing to make it possible.

    Get in touch

    We challenge established thinking to deliver innovative solutions and work hand-in-hand with our clients to achieve their vision and build infrastructure for the future. Harness the power of our people on your next critical infrastructure project.