Plunketts Road Bridge Repairs

About the project

This project required Pensar to structurally strengthen the bridge by increasing the capacity of the abutments to increase the load capacity of the bridge to 40 tonne.

Location

Barnawartha, Victoria

Client & Duration

Indigo Shire Council
4 March 2020 - 30 March 2020

Project Scope

  • Crack injection to the abutments and crosshead
  • CFRP strengthening to the abutments and crosshead using a combination of fabric and laminate, rods and anti-carbonation coating to all of the strengthened elements

Challenges

  • Delayed deliveries due to project supplies needing to be sought from metro areas
  • A regular supplier was unable to provide critical materials as committed so Pensar needed to find an alternative local supplier
  • Required planning to ensure that all resources were available for the completion of the project

Achievements

  • Upon commencement of the project, the scope was extended and completed within the original program
  • The project was successfully completed by a small crew as additional labour was unavailable due to Covid-19 travel restrictions
  • The successful completion of this project led to Pensar winning future work with the Murray Shire Council

Get the latest news

The future demands new thinking, new approaches, and new solutions. We’d love to share how we’re using the unique expertise and skills of our people to design a better world, and the work we’re doing to make it possible.

    Get in touch

    We challenge established thinking to deliver innovative solutions and work hand-in-hand with our clients to achieve their vision and build infrastructure for the future. Harness the power of our people on your next critical infrastructure project.