Pensar recently completed the design and construction of the SeaLink Vehicle Ferry Terminal Stage 1 upgrade at Redland Bay. To future proof the asset, SeaLink requirements included expanding the existing terminal by increasing the number of vehicular loading spaces, loading lanes and check in area capacity. The scope of works included marine dredging, installation of berthing piles, sheet piling, installation of inground services including water, sewer, fuel and electrical along with civil works including concrete structures, asphalting and line marking. We are looking forward to delivering Stage 2 later this year > Learn more.