Woongarra Pump Station

About the project

The facility's electrical systems were outdated and required upgrading to ensure the plant was operating under current technology.

Location

Bundaberg, Queensland

Client & Duration

Sunwater
August 2019 - September 2020

Project Scope

  • Supply and install of the HV switchboard, LV MCC, PLC and SCADA systems, retaining the existing pumps, motors and ancillary equipment.

Challenges

  • Short HV and LV change over windows
  • The HV board manufacturer was located overseas
  • The team had to work with dated equipment, using retrospective standards
  • Works were completed within a tight program
  • The location of the site made works challenging

Achievements

  • Pensar worked closely with Sunwater to complete the pump station shutdown, with minimal interruption to the supply of water to the Bundaberg farming community
  • Ergon, Sunwater and Pensar's HV designer worked together to achieve a complete HV design within a tight time frame to provide a HV switchboard within the scheduled program
  • Understanding and investigating the existing electrical infrastructure on site to complete an accurate design
  • Replacement of existing electrical equipment allowed for the functionality of a completely integrated system

Get the latest news

The future demands new thinking, new approaches, and new solutions. We’d love to share how we’re using the unique expertise and skills of our people to design a better world, and the work we’re doing to make it possible.

    Get in touch

    We challenge established thinking to deliver innovative solutions and work hand-in-hand with our clients to achieve their vision and build infrastructure for the future. Harness the power of our people on your next critical infrastructure project.