Mt Crosby East Bank Water Treatment Plant Elevated Tanks

Key capabilities: Bulk earthworks; Storage tanks; Sewerage & water reticulation
Project location: Mount Crosby, Queensland
Client name: Seqwater
Project duration: February 2014 – July 2014
Project value: $0.4 Million

About the project

Design & construction of two 150Kl service water tanks forming part of the Mt Crosby Water Treatment Plant upgrade.

Project scope

  • The scope of works included:
  • Demolition of 190Kl steel tank;
  • Bulk earthworks;
  • Establishment of a 30Kl temporary service tank:
  • 750mm bored piles
  • Construction of two cast in situ treats water tanks with cast in HDPE liner;
  • Suspended concrete roof;
  • 316 stainless steel pipework & fittings for DN200 inlet, DN200 outlet, DN 300 overflow and DN300 drain.

Innovations & highlights

  • Site constraints – difficult access point on sleep narrow slope track
  • Met a very tight delivery timeline