Edgeworth Diffuser Upgrade and Tank Remediation

About the project

Non-Process Water Infrastructure
Process Water Infrastructure

Pensar was engaged by Hunter Water to deliver the Edgeworth WWTW Diffusers Upgrade as Separable Portion 2 under the broader CS1429 Toronto WWTW Package 1 EAT Refurbishment contract. The works involved diffuser replacement and tank remediation across Bioreactors 1 and 2, supporting environmental licence compliance and improved aeration system performance.

Location

Edgeworth, NSW

Client & Duration

Hunter Water
Dec 2024 - Nov 2025

Project Scope

  • Supply and replacement of diffuser body and membrane assemblies
  • Installation of an additional 220 diffusers in each bioreactor, increasing installed diffuser capacity
  • Draining of tanks and removal of accumulated solids, grit and rag
  • Condition assessment of aeration pipework, diffuser systems, condensate lines and concrete
  • Concrete repairs, joint replacement, leak testing and diffuser pattern testing.

Challenges

  • Works were delivered within an operating wastewater treatment plant, requiring coordination with Hunter Water and Veolia to maintain treatment performance and
    operational continuity
  • Shutdown planning was required to minimise the duration and number of planned interruptions, with no unplanned disruption to operational assets
  • Accumulated grit and rag required tank draining, solids management, dewatering and disposal as putrescible waste in accordance with NSW EPA requirements
  • Fugitive hydrogen sulphide from the inlet works and bioreactor splitter pit required temporary H2S monitoring and defined mitigation controls
  • Confined space works, isolation interfaces and condition-based remediation required careful planning around live wastewater treatment assets.

Achievements

  • Safely delivered diffuser replacement, tank cleaning and remediation works with minimal operational impact
  • Maintained treatment performance and operational continuity throughout the bioreactor upgrades
  • Replaced aging diffuser bodies and membranes, restoring aeration system reliability
  • Increased installed diffuser capacity across Bioreactors 1 and 2 through activation of blank diffuser positions
  • Completed concrete repairs, joint replacement and condition assessments to support future maintenance planning
  • Modified aeration pipework to accommodate Hunter Water’s updated control philosophy and improve long-term functionality.

Get the latest news

The future demands new thinking, new approaches, and new solutions. We’d love to share how we’re using the unique expertise and skills of our people to design a better world, and the work we’re doing to make it possible.

    Get in touch

    We challenge established thinking to deliver innovative solutions and work hand-in-hand with our clients to achieve their vision and build infrastructure for the future. Harness the power of our people on your next critical infrastructure project.