Moreton Bay Rail Link

Power, Utilities

Project Highlights

  • Complex staging required to maintain traffic flow throughout construction
  • Construction on existing roadway during new pavement construction
  • Installation around existing services both underground and overhead such as Optic fibre, Gas and High Voltage Power
  • Disconnection and reinstallation of detector loops at intersection of Anzac Ave and Snook St


Client

Thiess

Location

Petrie, Queensland

Duration

December 2014 – July 2016

Client References   

Carlton Brogan _ Project Manager

Project Overview

The Moreton bay Rail Link Project is approximately 12.6km of dual track heavy gauge passenger rail line between Petrie and Kippa-Ring, six new stations and associated infrastructure required between Lawnton and Petrie and a shared pedestrian and cycle path along the new corridor.

Pensar Utilities completed three lighting and traffic signal packages with Thiess on the Moreton bay Rail Link project which included Rate 2, Rate 3 and traffic signal works as follows;

Project 1 _ Dohles Rocks Road

  • Construction of five new sets of traffic signals installed on Dohles Rocks Road, Duffield Road and Goodfellows Road.
  • Rate 2 lighting

Project 2 _ Brays Road Upgrade

  • Construction of new signals and modification to existing signals of Brays Road.
  • Rate 2 lighting

Project 3 _ Kippa-Ring Station

  • Installation of new traffic signal infrastructure, footings, poles and lanterns.
  • Rate 2 lighting

More projects